Checking planning applications across London used to take someone a full day, every day. The councils all use different systems, which is why it was such a slog. Now it happens overnight and anything worth knowing about shows up on a dashboard in the morning.
Not published. We do not put a client's invoice on our website without being asked to. What we can tell you is the shape of the ladder it sat on: starter builds are £300–£1,500 and anything built end to end across several systems starts at £3,000.
How fast
Live and collecting before the first full borough sweep finished.
What they own
The pipeline, the database and the dashboard, on their own infrastructure.
What runs unattended
Every overnight collection, across every borough, plus the alerting on top of it.
Measured
Every figure, and where to check it.
Each row links to the basis for that number — what was measured, over what period and how it was verified. Where part of it is still open, the entry says which part.